Project: Colac all-terrain crane steps up at Peterborough

This project was a lift where equipment was lifted onto the beach at the Bay of Martyrs at Peterborough for the restoration of the steps to beach for public access.  Our 55-ton all-terrain crane from Colac was used for this lift due to it having a small footprint which was crucial given environmentally sensitive area in which we had to work.